Gloucester Data Project

MSE were appointed as the electrical contractor with their proven track record of designing, installing and maintaining systems of the highest standards.

The Requirement

Multi occupied building within the centre of Gloucester comprises multiple offices and meeting rooms and the new network was to be installed throughout the refurbished South West wing on first floor level.

MSE installed basket containment in ceiling void and floor space back to the comms room with two number 42U floor standing cabinets to house all passive and active equipment.

All data and WIFI points cabled back to the 42u data cabinets within comms room.

507 Connectix CAT6 Outlets were spaced out amongst the South West wing with the majority being installed into recessed floor boxes, except for the WIFI network points within the ceiling void.  On completion of the works the structured cabling was certified using an approved cable certifier and results issued to the client. We also provided an “as fitted” drawing showing the location and number of all points installed to enable the end user to locate outlets with ease.

Challenges

Due to building being occupied whilst works were carried out this made it complicated when removing the original structured cabling install. We made sure at all times the existing clients network was kept operational with no downtime while works were taking place.

This was achieved throughout the project thanks to MSE methodical approach.

Continue Reading

Did you know we install Data networks?

MSE have been installing DATA networks for many years and have had our approved status confirmed again from Connectix.

To maintain the highest levels of quality, Connectix ensures that every company who installs our products has access to the right support; from basic training, through to up to date knowledge of industry standards and trends. To date Connectix has trained over 5000 installation engineers and has more than 200 Approved Installers throughout the UK and Ireland.

To gain Approved Installer status, Connectix installers must be fully trained in installation practices and show excellence throughout all aspects of their business. The Approved Installer Status can enhance an organisations’ reputation within the Structured Cabling Industry and emphasise to the client that the required high level of expertise has been reached.

Please get in touch, sales@mse-uk.com

Continue Reading

Birmingham Skyline

Today we had he pleasure of visiting an apartment building in Birmingham city centre. We are tasked we providing a solution to a ventilation issue following some major Works to the roof top area. We couldn’t help but observe the amazing views and skyline!

What do you think?

Continue Reading

National Trust – Croome

Tonight we have been very busy replacing the existing toilet extraction systems at the old RAF site near Worcester.

There’s more than meets the eye at Croome. A secret wartime airbase, now a visitor centre, was once a hub of activity for thousands of people. Outside is the grandest of English landscapes, ‘Capability’ Brown’s masterful first commission, with commanding views over the Malverns. The parkland was nearly lost, but is now great for walks and adventures with a surprise around every corner. At the heart of the park lies Croome Court, once home to the Earls of Coventry with four floors to explore. The 6th Earl of Coventry was an 18th century trend-setter and today Croome follows his lead by using artists and craftspeople in the house to tell the story of its eclectic past in inventive ways, perfect for making new discoveries.

Credit: www.nationaltrust.org.uk/croom


Continue Reading

Union House, London

Today we have been in London checking the progress on Union House near Waterloo.

Union house is a large commercial building in the heart of London boasting great rail links and views over the Skyline.

MSE are currently installing new Panasonic heat recovery air conditioning to six or the eight floors.

Works are set to be completed at the end of April. 

Continue Reading

Sainsbury’s Plymouth

This week we are in Plymouth!!!

We have just started an eleven fan coil Mitsubishi Electric heat recovery VRF installation for the back of house area at Sainsbury’s in Plymouth.
The installation will take 4 weeks and has to be completed out side of working hours.

More photos to follow…

Continue Reading

Rhubarb Home, Malvern

We popped along to a previous client yesterday in the beautiful Malvern Hills. Rhubarb Home is a three story delightful independently owned home furnishing store just doors away from from its sister store Rhubarb.

MSE had the pleasure of working with Nigel and Sara Morris last year ensuring their two shops didn’t over cook in the summer months.

MSE supplied, installed and commissioned two Daikin ceiling mounted cassette type units which provide cooling and heating. With regular maintenance from a member of our service team, these units will be cooling customers for years to come.


Rhubarb Home can be found on Church St, Malvern WR14 2AA.

Continue Reading

FGAS Renewed

Hot of the press!! MSE have been FGAS Certified for a further 3 years. 

This certificate demonstrates that we employ appropriately qualified personnel in a sufficient number to cover the expected volume of activities in the installation, commissioning, decommissioning, repair, maintenance or servicing of stationary refrigeration, air conditioning and heat pump equipment.

Continue Reading