Reinstatement Works

Reinstatement works just completed following removal of a temporary classroom at a school. Consisting of patching of asphalt playground, landscaping and re-turfing of grass area.

Posted on By Simon
Read more

University Legionella Compliance Works

MSE have been completing installation of pipe work lagging, replacement thermostatic valves, chlorination and recommissioning of water boilers on 20 student shower blocks.

Posted on 31 Aug 2021 By Simon
Read more

Rolec Car Charger

We have been working in a lovely rural location fitting a electrical vehicle charger. Customer has purchased their first EV with Rolec Homesmart they can control and integrate their home energy tariff.

Posted on 23 Aug 2021 By Simon
Read more

Concrete Generator Base

MSE building projects division have been busy completing a generator base for a large warehouse project. Watch this space for updates on the electrical and air conditioning upgrades we are currently completing!

Posted on 20 Jul 2021 By Simon
Read more

AC Installation New Street

MSE are just about to begin a large air conditioning installation within Birmingham City Centre. This comprises of Daikin VRV systems and single split systems. Keep your eyes peeled for the finished job.

Posted on 19 Jul 2021 By Simon
Read more

London Laboratory Refurbishment

MSE completed refurbishment of basement laboratory in London. This electrical installation included a new split load distribution board, dado trunking, LED lighting. Mechanical installation included Daikin split air conditioning unit and Daikin heat reclaim ventilation unit.

Posted on 16 Jul 2021 By Simon
Read more

Leisure Centre Refurbishment

MSE have been busy completing the electrical part of a refurbishment contract at a leisure centre. This included a new gym area, spin room and spa area.

Posted on 29 Jun 2021 By Simon
Read more

Chiller Installation

MSE supplied and installed a new chiller to an existing plant room. This included a new sub main power supply feeding a new CT scanner within a Hospital in the West Midlands.

Posted on 18 May 2021 By Simon
Read more

Landscape Lighting Project

MSE are coming to the end of an external lighting project in Coventry. Our engineers were on site after the sun went down last week. This enabled them to complete lux level tests ready for handover this week.

Posted on 5 May 2021 By Simon
Read more

Electric Vehicle Chargers

MSE have been busy installing vehicle chargers over the past couple of weeks. PEN fault detection devices have made installations easier without the risk of installing earth rods and damaging existing buried services. It also creates a neater installation in our opinion.

Posted on 19 Apr 2021 By Simon
Read more