AuthorTim

HomeArticles Posted by Tim

MSE sponsor Worcester Warriors’ Isaac Miller

MSE have sponsored Worcester Warriors player Isaac Miller for this season.

Isaac Miller joined Warriors from London Scottish in the summer of 2018.

He was injured on his debut against Benetton in Trevisio in August 2018 and missed the first three months of the season.

Miller made his competitive debut in the European Challenge Cup match in Pau in December 2018 and went on to make five more appearances – all as a replacement – during the season. He signed a contract extension midway through the season.

The English-qualified hooker has represented Scotland at Under 20 level and previously captained Loughborough Students in National League One.

Miller impressed in the Championship during his one season at Scottish and also captained the side on occasions.

Continue Reading

Gloucester Data Project

MSE were appointed as the electrical contractor with their proven track record of designing, installing and maintaining systems of the highest standards.

The Requirement

Multi occupied building within the centre of Gloucester comprises multiple offices and meeting rooms and the new network was to be installed throughout the refurbished South West wing on first floor level.

MSE installed basket containment in ceiling void and floor space back to the comms room with two number 42U floor standing cabinets to house all passive and active equipment.

All data and WIFI points cabled back to the 42u data cabinets within comms room.

507 Connectix CAT6 Outlets were spaced out amongst the South West wing with the majority being installed into recessed floor boxes, except for the WIFI network points within the ceiling void.  On completion of the works the structured cabling was certified using an approved cable certifier and results issued to the client. We also provided an “as fitted” drawing showing the location and number of all points installed to enable the end user to locate outlets with ease.

Challenges

Due to building being occupied whilst works were carried out this made it complicated when removing the original structured cabling install. We made sure at all times the existing clients network was kept operational with no downtime while works were taking place.

This was achieved throughout the project thanks to MSE methodical approach.

Continue Reading

Did you know we install Data networks?

MSE have been installing DATA networks for many years and have had our approved status confirmed again from Connectix.

To maintain the highest levels of quality, Connectix ensures that every company who installs our products has access to the right support; from basic training, through to up to date knowledge of industry standards and trends. To date Connectix has trained over 5000 installation engineers and has more than 200 Approved Installers throughout the UK and Ireland.

To gain Approved Installer status, Connectix installers must be fully trained in installation practices and show excellence throughout all aspects of their business. The Approved Installer Status can enhance an organisations’ reputation within the Structured Cabling Industry and emphasise to the client that the required high level of expertise has been reached.

Please get in touch, sales@mse-uk.com

Continue Reading

Birmingham Skyline

Today we had he pleasure of visiting an apartment building in Birmingham city centre. We are tasked we providing a solution to a ventilation issue following some major Works to the roof top area. We couldn’t help but observe the amazing views and skyline!

What do you think?

Continue Reading